93%
Avg Estimate Accuracy
635
Training Data Points
5
Active Data Sources
4
Completed Projects Learned
Project Training Records
Each completed project teaches the AI to improve estimates, predict scope changes, and recommend materials.
Queen West 1-Bed (2024)
Dec 2024Electrical typically 12% over in pre-2000 condos due to aluminum wiring replacement.
94%
Accuracy
2
Changes
142
Data Pts
Liberty Village Studio (2024)
Oct 2024Small units (<600 sq.ft.) have higher per-sqft costs due to same fixed overheads.
97%
Accuracy
1
Changes
98
Data Pts
Harbourfront 2-Bed (2024)
Aug 2024Waterfront buildings often have concrete ceilings requiring tapcon anchoring for all ceiling fixtures.
91%
Accuracy
3
Changes
185
Data Pts
St. Lawrence Market Loft (2023)
May 2023Heritage buildings require additional permits and structural engineering review. Budget 15% contingency.
88%
Accuracy
4
Changes
210